28-01-2013  @RISK software training in Chile by Manuel Viera
08-01-2013  Metaproject TV - Chile and Peru: Mining Brothers
26-11-2012  Metaproject featured in Mining.com
19-11-2012  New episode from MetaprojectTV: Peggy Castellano - Life changing Mining
09-11-2012  METAFORICO IS REBORN: Metaproject 20th anniversary issue
24-10-2012  CHILEAN MINING ENGINEERS´ PROPOSAL: A LITHIUM NATIONAL COMPANY
22-10-2012  FOREIGN MEDIA: CHUQUI GOES UNDERGROUND!
22-10-2012  NOBEL PRIZE IN ECONOMIC GOES TO THE THEORY OF STABLE ALLOCATIONS
18-10-2012  VIERA VISITS UNIVERSIDAD DE LAS AMÉRICAS (UDLA)
06-08-2012  METAPROJECT TRAINS AT ITS OFFICES IN CALAMA

METAPROJECT AWARDED NEW ENGINEERING PROJECT

 3,000 m3 has the new emergency winze,  and includes manifold, piping design and pump capacity to address existing material to well.

The project, linked to detailed engineering including mechanical and civilian specialties, will be located at Division Andina. Its use consider automatic valves to start a new line of water discharge to the river and ​​Metaproject will make the engineering details design.

Date: 05-07-2012 - Reading: 4542